• Home
  • Browse
    • Current Issue
    • By Issue
    • By Author
    • By Subject
    • Author Index
    • Keyword Index
  • Submit Paper
  • Journal Info
    • About Journal
    • Aims and Scope
    • Editorial Board
    • Advisory Editorial Board
    • Editorial Staff
    • Publication Ethics
    • Indexing Databases
    • Related Links
    • FAQ
    • Peer Review Process
    • News
  • Guide for Authors
  • Reviewers
  • Contact Us
 
  • Login
  • Register
Home Article Info
  • Save Records
  • |
  • Printable Version
  • |
  • Recommend
  • |
  • Export to
    RIS
International Journal of Supply and Operations Management
Articles in Press
Current Issue
Journal Archive
Volume Volume 3 (2016)
Volume Volume 2 (2015)
Volume Volume 1 (2014)

The Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem

Articles in Press, Accepted Manuscript , Available Online from 12 March 2017  XML PDF (1091 K)
Document Type: Research Paper
Authors
1 Denis Pinha ; 1 Rashpal Ahluwalia; 2 Pedro Senna
1West Virginia University, Morgantown, WV, USA
2Federal Center for Technological Education of Rio de Janeiro, Rio de Janeiro, Brazil
Abstract
This paper presents the formulation and solution of the Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem. The focus of the proposed method is not on finding a single optimal solution, instead on presenting multiple feasible solutions, with cost and duration information to the project manager. The motivation for developing such an approach is due in part to practical situations where the definition of optimal changes on a regular basis. The proposed approach empowers the project manager to determine what is optimal, on a given day, under the current constraints, such as, change of priorities, lack of skilled worker. The proposed method utilizes a simulation approach to determine feasible solutions, under the current constraints. Resources can be non-consumable, consumable, or doubly constrained. The paper also presents a real-life case study dealing with scheduling of ship repair activities.
Keywords
Resource Constrained Project Scheduling; Mathematical Formulation; Discrete Event Simulation; Decision Support System
Main Subjects
operations planning,scheduling & control
Statistics
Article View: 11
PDF Download: 10
Home | Glossary | News | Aims and Scope | Sitemap
Top Top

linkedin
© 2017 - Journal Management System. Created by sinaweb.